Project: Hydro Processing Pilot Plant

Client: : Takreer Research Centre, Abu Dhabi

Technical Specifications

The plant for Hydroprocessing Pilot Plant was supplied to Takreer Research Centre in Dec 2012. The Plant consists of Gas feed, two liquid feed systems – one for hydrocarbon feed and second for sulfiding, twin reactors and a common product separation with LP stripping and product collection module. Reactors can be operated either in upflow, downflow or one at a time.

Process : Hydrocracking, Design Temp : 600 Deg C, Design Pressure : 220 bar g, No. of Reactors : 2, Total Size of Reactors : 10/40 cc

Gas/liquid feed, reactor temperature and pressure are controlled using PC-PLC based control system.